Respuesta :
Answer:
90 Minutes.
Explanation:
The average of 120 and 240 is 180. Then divide that by 2 since there is 2 people, and the answer is 90 minutes.
The number of minutes it will take both Mark and Alexis to load all packages is 90 minutes.
Given that Mark can load a truck with packages in 120 minutes and;
Alexis can load the same number of packaged in 240 minutes;
Then we have the average time for both of them as:
Average= (120 + 240) ÷ 2 = 360 ÷ 2 = 180
Given that they were two people involved, then we have 180 ÷ 2 = 90.
Hence, in this case, it is concluded that the correct answer is option B. 90 minutes.
Learn more here: https://brainly.com/question/13989292