Answer:
Allocated overhead= $43,180
Explanation:
Giving the following information:
Cost of direct materials used $42,600
Cost of goods manufactured $124,200
Cost of direct labor ($30 per hour)= $76,200
Manufacturing overhead cost is allocated at the rate of $17 per direct labor hour.
Allocated overhead= predetermined overhead rate* actual allocation base
Allocated overhead= 17* (76200/30)= $43,180