Answer:
Average fixed cost= $1.43
Explanation:
Giving the following information:
Production costs:
Rent= $5,000
Direct labor= $2,500
Direct material= $5,000
Usually, the direct labor cost is variable. In some conditions, it is a fixed cost. We will consider it as a variable cost.
Total fixed cost= 5,000
Average fixed cost= 5,000/3,500
Average fixed cost= $1.43