Answer:
Total variable cost= $104,000
Explanation:
Giving the following information:
Direct materials $35,000
Direct labor 31,000
Variable manufacturing overhead 38,000
The variable costing method incorporates all variable production costs (direct material, direct labor, and variable overhead).
Total variable cost= 35,000 + 31,000 + 38,000
Total variable cost= $104,000