Answer:
4 minutes, because in 3 minutes, the slower copier has done 1/4 of the job (at a 12 minute pace ). That means that during the same 3 minutes, the faster copier did 3/4 of the job.
So the faster copier is on pace to complete the entire job in 4 minutes (3 X 4/3).
Step-by-step explanation: