Working together, two copy machines can finish a copy job in 3 minutes. The slower copier can finish the job in 12 minutes. How many minutes would it take for just the faster copier to finish the job?​

Respuesta :

fxvuu

Answer:

4 minutes, because in 3 minutes, the slower copier has done 1/4 of the job (at a 12 minute pace ). That means that during the same 3 minutes, the faster copier did 3/4 of the job.

So the faster copier is on pace to complete the entire job in 4 minutes (3 X 4/3).

Step-by-step explanation: