Answer:
Results are below.
Explanation:
First, we need to calculate the activity rates using the following formula:
Predetermined manufacturing overhead rate= total estimated overhead costs for the period/ total amount of allocation base
Materials handling= 40,000 / 1,000= $40 per requisition
Machine setups= 21,500 /500= $43 per setup
Quality inspection= 33,000 / 600= $55 per inspections
Now, we can allocate overhead to each product:
Missile range instruments:
Materials handling= 40*400= $16,000
Machine setups= 43*200= $8,600
Quality inspection= 55*200= $11,000
Total allocated overhead= $35,600
Space pressure gauges:
Materials handling= 40*600= $24,000
Machine setups= 43*300= $12,900
Quality inspection= 55*400= $22,000
Total allocated overhead= $58,900
Finally, the unitary overhead cost:
Missile range instruments:
Unitary allocated overhead= 35,600/50= $712
Space pressure gauges:
Unitary allocated overhead= 58,900/300= $196.33